Stormwater Mitigation Report
Stormwater Mitigation
Limited Time Offer$1,800 Excluding GST
Overview of the process
Give us a call on 021 808 593 if you would like to discuss further requirements or if you have any questions. Otherwise just fill out the contact form and we will be in touch with you.
We will need a copy of your site plans from your architect.We will figure out the size and the best location for the detention tank.
You will receive a stormwater mitigation report which lays out the requirements for your site. This will indicate the size of the tank, the location and also the hydraulic modelling.
Frequently asked Questions
How Long will it take to complete?
Approximately 1-2 weeks
How many lots does this cover?
Our $1000 deal includes any site up to 6 lots.
- Let us know if you have multiple lots and we can organise a deal to help deliver a cost effective solution.
Let's get started
The easiest way to get started is to fill out this contact form. We can then get in touch with you to discuss your individual requirements.
Check out our other deals!
Topographic Survey - $1500
Topographic Surveys. Site Setouts. Starting a subdivision
Flood Risk Assessment - $1950
Flood Risk Assessment. Overland flow paths, flood plains.
Seismic Assessment - $900
Seismic structural assessments, get in touch to discuss how we can help.